POUR MORE CONCRETE WITH LESS LABOR
See what less labor could mean for your bottom line.
No spreadsheet. No math. Start with the sample job, change the numbers you know, and your estimate updates automatically.
Three easy steps
- Pick a job size.Use a typical pour.
- Change what you know.Leave a sample number if you are unsure.
- Read your estimate.The orange number updates automatically.
Your estimate
Based on the job numbers you entered.
more on one 100-yard job by using 176 fewer worker-hours.
Based on 24 similar 100-yard jobs per year.
See the full job comparison
One 100-yard job
5,400 ft² at 6 inchesThis is not a full job-cost estimate. It does not include every possible expense, such as pumping, mobilization, fuel, equipment, overhead, or financing.
Built from real project examples. The quick estimate uses Dragon Screed’s documented 25-, 50-, 100-, and 200-yard job scenarios and scales between them.
READ THE RESULT CORRECTLY
This is a planning estimate, not a promise.
The model isolates the labor difference between traditional subgrade and screed work and the Dragon Screed workflow. Material costs are held equal between methods.
Actual results vary with crew experience, site conditions, machine configuration, travel, financing, maintenance, utilization, and demand. Use your exact crew numbers when you have reliable job history.
The sample pricing uses national planning defaults updated in August 2026. Local contractor bids, wage burdens, ready-mix prices, reinforcement requirements, and hauling costs can differ substantially, so replace the sample values with current local quotes whenever possible.
